The Challenge

Site assessment in February 2016 identified conditions typical of a complex slope failure:

  • Very steep gradient with dense blackberry colonization, a common indicator of disturbed, unstable ground
  • Active seepage water emerging across the slope face, a key driver of slope instability and ongoing movement
  • Compacted soils in places, limiting infiltration and root establishment
  • Large slide extent: the scale of the failure required a systematic installation approach working progressively up the slope

Seepage water is one of the most important factors in landslide restoration. Unless drainage is managed, by intercepting and redirecting water rather than letting it sheet across the slope face, revegetation is undermined by continued soil saturation and movement.

Approach

Installation began in late February 2016 and proceeded systematically up the slope, with work documented at regular intervals through late March and into April. The installation was completed by April 10, 2016.

Soil bioengineering techniques applied to steep landslide terrain typically combine:

  • Live stake installation using willow and other pioneering species, dormant cuttings driven directly into the slope to intercept seepage, stabilize the surface, and initiate vegetative cover
  • Wattle fences or brush layering on flatter terrace areas, creating micro-topography that traps sediment and establishes rooted plant material in layers
  • Live pole drains where seepage concentration points require active water interception and redirection

The approach treats seepage as a resource, directing it to planted material rather than letting it saturate the slope, while simultaneously building root biomass that will progressively reinforce the soil structure.

Results

Monitoring photographs document a clear recovery trajectory:

  • May 2016: Active growth visible on installed materials; vegetation establishing across the slope

  • July–August 2016: Substantial canopy development; slope face increasingly covered

  • November 2016: Established vegetation entering dormancy; structural coverage maintained

  • September 2017: Woody vegetation visibly established across much of the photographed area

  • May 2018: Dense woody cover across much of the slope; a second view recorded a remaining exposed central face

  • November 2018: Dormant-season woody cover remained visible across much of the monitored slope

The dated photographs show substantial vegetation establishment within two growing seasons while also documenting remaining exposed areas. They are visual field evidence, not a measured stability or survival study.

Soil bioengineering for landslide recovery, addressing the causes of instability, not just the surface. Request a Site Assessment →

Juniper Place Landslide: Installation and Early Establishment

The Juniper Place field record follows a steep, seeping slide through installation in early 2016, visible first-season growth, and monitoring visits through 2018.

Steep eroding landslide scar with seepage at Juniper Place before restoration, February 2016

February 2016: a large, steep, seeping slide.

February 2016 photographs document a very steep slope with seepage, compacted soils, and blackberry cover. The treatment focused on the slope face and seepage conditions rather than only the toe.

Over several weeks the crew installed wattle fences from the bottom upward, using each completed row as access for the next. The contour-aligned structures were intended to interrupt moving soil and hold moisture near the living cuttings. The field record also documents work intended to manage seepage across the slope.

Seepage on the Juniper Place slope before treatment, February 12, 2016.

Wattle fences built up the whole face, bottom to top.

Close-up of living willow laid horizontally behind vertical posts in a wattle fence at Juniper Place

Each fence uses living willow laid behind the vertical posts, then backfilled and lightly tamped down.

Up close, a wattle fence uses long willow stems laid behind driven vertical posts, then backfilled and lightly tamped down. It provides a low contour barrier while the living material has an opportunity to root. The installation was documented as complete on April 10, 2016.

Within weeks of finishing, the cuttings were sprouting. By midsummer 2016 the bare scar was greening over. The photographs show visible above-ground growth; they do not measure root development or slope movement.

Willow cuttings sprouting and greening the restored Juniper Place slope by summer 2016

By summer, the cuttings were growing and the face was greening.

Vegetation growing among wattle fences on the Juniper Place slope, May 29, 2016.

May 29, 2016: vegetation growing among the installed wattle fences.

By 2017 and 2018, later photographs show dense woody growth across much of the slope. May 2018 photographs also show a remaining exposed central face with installed woody material visible. The record documents vegetation development across the treatment area; it is not a measured stability or survival study.

References

  • Polster, D.F. 1997. Restoration of Landslides and Unstable Slopes: Considerations for Bioengineering in Interior Locations. 21st BC Mine Reclamation Symposium, Cranbrook, BC.

Learn more

Juniper Place: recovery documented over time

Dated photographs follow the treated landslide from installation through first-season growth, established woody cover, and the 2018 monitoring record.

Treatment, March 2016Woody cover, September 2018

These photographs document the same landslide area from different field positions. They are not a registered fixed-camera pair, and the photographs do not by themselves measure slope stability or plant survival.

  1. Vegetation on the treated Juniper Place slope, July 6, 2016.July 6, 2016Vegetation on the treated slope during the first growing season.
  2. First-season woody growth across much of the Juniper Place treatment, August 24, 2016August 24, 2016First-season growth covered much of the photographed treatment area.
  3. Established woody growth across the Juniper Place landslide treatment, September 23, 2017September 23, 2017Woody growth was established across the photographed slope.
  4. Woody vegetation across much of the Juniper Place slope, May 28, 2018May 28, 2018The monitoring visit recorded dense cover across much of the slope.
  5. Remaining exposed central face with installed woody material visible at Juniper Place, May 28, 2018May 28, 2018, detailA second view recorded a remaining exposed central face and visible installed material.

Dates are taken from the original Juniper Place field presentation and image metadata.