Soil Bioengineering for Steep and Unstable Slopes
This presentation uses natural disturbance and recovery as a basis for treating steep and unstable slopes. It covers surface preparation and living plant treatments, with dated examples from Juniper Place, the Mackenzie Valley Fibre Link, mine sites, and landslides.
33:42 · 185 slides · Historical presentation · No recorded narration
Use fullscreen to read detailed slides. Pause or change playback speed as needed. The original slide layouts, animation effects and visible credits are retained.
Apply these ideas to your site
Have a steep or unstable slope that needs assessment? Contact PES to discuss site conditions and restoration planning.
Discuss your restoration project
Explore the presentation
Related methods and services
Juniper Place Landslide Restoration · Living Structural Systems in Soil Bioengineering · Site Assessment & Restoration Planning
About this presentation
Source: Soil Bioengineering for the Treatment of Steep and Unstable Slopes.pptx. Slides by David Polster; individual image and diagram credits remain in the presentation. This video includes the complete supplied deck. It is an archive slideshow, not a recording of the spoken conference session.
Dates, costs and examples reflect the original presentation. Treatment suitability depends on current site conditions and requirements.
Read the text from the slides
Soil Bioengineering for the Treatment of Steep and Unstable Slopes
David Polster, M.Sc. R.P.Bio.
Polster Environmental Services Ltd.Ecological restoration is the process of assisting the recovery of an ecosystem that has been degraded, damaged, or destroyed.
Successional model for restoration – start with disturbance.
At one point not long ago most of Canada was covered by ice…
…and now we have landscapes covered with a diversity of ecosystems.
How did this happen?Compared to Continental Glaciation some of our largest disturbances look small.
200 tonne trucksNatural disturbances dwarf human disturbances…
…and give us opportunities to see how these disturbances recover.
Natural landslides...
Frank Slide
Over time natural processes “restore” these sitesStudying how this happens provides a foundation for the design of restoration programs for our largest disturbances
By looking at natural solutions to revegetation we can develop effective restoration systems
See any similarities???
Fine textures at the top, free draining in the middle, larger rock at the bottom
By pushing the fine textured materials over the face we can eliminate the limitations of the coarse substrate.
By making the surface rough and loose we can control erosion
How do natural processes prevent erosion?
Trees turn up large clumps of soil, leaving pits in the forest floor
As the old root mass weathers and breaks down,
the mound of soil starts to attract vegetation,
until it becomes a mound on the forest floor.
Natural forest floors are rough and loose and have woody debris.
How can we deal with erosion without grass and legume seeding?
“D 10” BulldozerSpreading soil material…
“D 10” BulldozerErosion starting on smooth surface before spreading is even completed.
Making the surface rough and loose
Strips allow woody debris to be applied
Roughened the whole surface
Making surfaces rough and loose controls erosion and enhances native species establishment.
Cost of rough and loose treatment at Kemess Mine was $715/ha while hydroseeding costs about $3,500/haRough and Loose Restoration Treatments
Northern BC, September 22, 2014Creating ideal conditions for vegetation growth.
NE Alberta
August 27, 2012Happy willows
NE Alberta,
September 10, 2014Gas plant near Edmonton to be restored,
March 11, 2010Rough and loose, April 14, 2010
Planting pioneering vegetation,
April 14, 2010, note fence.Cuttings growing, June 24, 2010
September 11, 2010
Red-osier Dogwood
August 19, 2011
Two growing seasonsFebruary 24, 2015
September 25, 2015
Six growing seasons after restorationFebruary 23, 2016
The use of natural processes can provide cost-effective solutions for the restoration of drastically disturbed sites.Rough and loose Outpost Island, Great Slave Lake, NWT, Canada
Soil bioengineering is the use of living plant materials to perform some engineering function
Soil bioengineering solutions for the Point Grey Cliffs
UBC Slopes, March 6, 1989
70o SlopeDoesn’t change slope (70 degrees)
Changes conditions for vegetation growth
1989UBC slopes initial test planted winter of 1987/88, May 7, 1988
Wattle Fences
UBC Slopes, May 28, 1990
UBC Slopes, January 18, 1990
UBC Slopes, March 25, 1999
UBC Slopes, July 4, 2012
UBC Slopes, July 4, 2012
UBC Slopes, November 26, 2012
UBC Slopes, January 21, 2016
Juniper Place Landslide Restoration
Very steep (65o) with blackberries, February 10, 2016
Lots of seepage water, February 12, 2016
Some compacted soils, February 12, 2016
This is a large slide, February 22, 2016
February 22, 2016
March 5, 2016
March 31, 2016
April 10, 2016
Done!May 13, 2016
GrowingMay 29, 2016
Treatments of disturbances,
Mackenzie Valley Fibre Link
681.5 AreaTrying to block, or re-route water causes problems
681.5 Area681.5 Area
Seepage is an issue.Concentration of flows is an issue.
681.5 AreaStraw bales and sand bags have not solved the problems
681.5 AreaHow do natural systems recover from disturbance?
681.5 Area681.5 Area
Look at what is springing up after the fire!The native pioneering species,
Bebb’s WillowDense live staking slows flows and prevents erosion,
and grows into a willowy wetland.
Putting in a cutting or two per meter of line and backfilling the trench would fix this problem
681.5 Area1028.5 Area
Sand bags haven’t helped here either1028.5 Area
Have the straw bales helped?Dense live staking
Broadway Run Slide, Cowichan RiverSlows flow velocities, adds root strength and removes excess water. Assists recovery.
March 14, 2015June 8, 2015, and they grow!
What about steep slopes and flowing water?
Great Bear AreaHave straw bales, silt fences and sand bags helped here?
Great Bear AreaSept. 22, 1987
Sept. 22, 1987
Lunchtime
Steep slopes can be treated with wattle fencesJuly, 1988
And these grow as wellJuly 9, 2005
August 1, 2009
September 25, 2015
Most of the materials we need to fix these sites are already here.
Natural processes can solve the problems on the Mackenzie Valley Fibre Link
McIntyre Creek, Yukon bioengineering class, October, 2005
End of Day
Completion the next day
The various freeze/thaw cycles through the winter of 05/06 killed the cuttings.
None of them lived,
a spring planting might have avoided this issue.Colomac Mine, NWT Restoration Strategy
Identify filters:
Compaction
Un-natural landforms
Steep slopes
Coarse textured substrate
Lack of local seedsRe-slope and re-contour waste rock dumps to address landform and texture limitations
Make it rough and loose and plant pioneering species
Plant pioneering species in riparian areas
Seed in pioneering species
Local AlderPlant specialist species
Stand back and watch it grow…
Growing a riparian ecosystem…
How do we fix this?
May 5, 2010Site 1, June 26, 2014
Sullivan Creek Landslides, Boundary Dam, Seattle City LightSite 1, June 25, 2014
What is preventing recovery?Site 1, Learning techniques October 8, 2015
Site 1, Collecting cuttings, October 8, 2015
Site 1, Building up the slope, October 8, 2015
Site 1, Work completed for the year, October 29, 2015
Site 1, June 2, 2016
Site 1, Growing, June 2, 2016
Site 1, Growing, June 2, 2016
Collecting cuttings at Germaine Creek, YT, Fall, 2004
Soaking cuttings at Germaine Creek, Fall, 2004
Live gravel bar staking at Germaine Creek, Fall, 2004
Live gravel bar staking at Germaine Creek, Fall, 2004
Live gravel bar staking at Germaine Creek, Fall, 2004
Klondike River at Germaine Creek, Break-up, 2005
Klondike River at Germaine Creek, May 19, 2005
Klondike River at Germaine Creek, June 3, 2005
Live gravel bar staking at Germaine Creek, June, 2005
Live gravel bar staking at Germaine Creek, September 6, 2005
Live gravel bar staking at Germaine Creek, September 16, 2005
Live gravel bar staking at Germaine Creek, August 8, 2006
Live gravel bar staking at Germaine Creek, September 14, 2006, significant sand deposition.
30 cm in this area…
August 12, 2007
August 6, 2007
Additional sediment and woody debrisJuly 14, 2008
August 5, 2014
August 5, 2014
August 5, 2014
Brush layers
Kemess Mine, Northern BCKemess Mine, Northern BC
Live Palisades
Live Palisades Cross Section
Cottonwood poles are collected and soaked
Excavator used to dig trench to water table, Bulkley River, Northern BC
Live palisade construction and live gravel bar staking
Cuttings grow forming a wall of woody vegetation
Mimics natural cottonwood standsCottonwood growth after 3 years
Live Pole Drains
Intersecting the water
Installing Live Pole Drains, 1985
Drains moisture immediately
1986, first spring after installationCuttings sprout and grow, 1988
July 16, 1999
Business end of live pole drain,
July 16, 1999Still draining water after 14 years, July 16, 1999
Note rock shapeAugust 1, 2009
Business end of live pole drain, August 1, 2009
Water flow area in a dry year, 24 years after installation, August 1, 2009
Eventually these seepage areas are colonized by Devil’s Cub and Cedar
Is this an effective erosion control system???
What about this???
Live silt fencing slows flows and allows sediments to drop out
A high-tech solution, live silt fences, February 20, 1992
February 20, 1992
May 11, 1992
January 30, 1993
April 9, 1997
April 9, 1997
Natural mass movements associated with melting permafrost
Large ice lenses form the scarp on these slides
A history of permafrost melt slides,
a history of pioneering species recovery.Natural processes provide solutions to even the toughest restoration problems
Of course there are many other elements of restoration, but…
… if you get the pioneering species, find and follow the natural solutions and build in the social and cultural values, restoring difficult sites is relatively straightforward.
Remember…
Whatever you do… Have Fun!Questions ???
Contact: d.polster@telus.netNatural Processes for the Restoration of Timmins Area Sites
Traditional reclamation treatments -
- How much did this cost?Are these treatments effective?
What about erosion control?
Natural processes establish a variety of species for free on this compacted waste rock area.
Imagine what could have happened if this site was rough and loose and had woody debris scattered on it?
The dominant species is a poplar.
There is also willow,
and Aspen,
and Spruce
How much do you think all this cost?