Wet-side Soil Bioengineering: RRNW 2016
This presentation documents wet-side soil bioengineering treatments at Point Grey Cliffs and UBC slopes, then shows examples of wattle fences, brush mattresses, live pole drains, modified brush layers, gully breaks, silt fences, palisades, pocket planting, and gravel-bar staking.
40:40 · 223 slides · Historical presentation · No recorded narration
Use fullscreen to read detailed slides. Pause or change playback speed as needed. The original slide layouts, animation effects and visible credits are retained.
Apply these ideas to your site
Planning work on a wet slope, streambank, or riparian site? Contact PES to discuss restoration options for your site.
Discuss your restoration project
Explore the presentation
Related methods and services
Riparian & Streambank Restoration · Wattle Fencing · Living Structural Systems in Soil Bioengineering · Live Gravel Bar Staking
About this presentation
Source: River Restoration Northwest wet-side soil bioengineering workshop, 2016. Slides by David Polster; individual image and diagram credits remain in the presentation. This video includes the complete supplied deck. It is an archive slideshow, not a recording of the spoken conference session.
Dates, costs and examples reflect the original presentation. Treatment suitability depends on current site conditions and requirements.
Read the text from the slides
Point Grey Cliffs
Wet Side Soil Bioengineering TreatmentsPoint Grey Cliffs ca 1972
UBC Slopes, Winter 1988/89
UBC Slopes, March 6, 1989
70o SlopeDoesn’t change slope (70 degrees)
Changes conditions for vegetation growth
1989UBC slopes initial test planted winter of 1987/88, May 7, 1988
Wattle Fences
UBC Slopes, May 28, 1990
UBC Slopes, January 18, 1990
UBC Slopes, 1996
UBC Slopes, March 25, 1999
UBC Slopes, March 25, 1999
UBC Slopes, July 4, 2012
UBC Slopes, July 4, 2012
UBC Slopes, November 26, 2012
UBC Slopes, November 26, 2012
UBC Slopes, January 21, 2016
UBC Slopes, January 21, 2016
UBC Slopes, March 25, 2509
UBC Slopes piping failure
UBC Slopes piping failure, brush mattress
UBC Slopes piping failure, re-establishing slope using wattle fences
UBC Slopes piping failure, brush mattress draining moisture
UBC Slopes piping failure, excellent growth with ample moisture
Nature’s barbed wire…
Small slumps under straw blanket
Moisture sensitive soils treated with “Soil Guard”
Soil slumps under spray on blanket
Moisture sensitive soils treated next with coco-fibre matting
… with a similar result.
As the winter progressed, the slope continued to unravel.
Repairs initiated
Wattle fences hold the mud but let the water out.
The cuttings love the wet soil…
… and grow well.
May 21, 2008
March 23, 2010
Road fill failure
At construction, fall 1995
June 25, 1997Catching rolling stones
We can get satisfaction!Two types of treatment
$320,000
$13,000Substantially built…
…but does it contribute ecologically to the site?Road deactivation near creek
August 18, 1987Sept. 22, 1987
Sept. 22, 1987
LunchtimeJuly, 1988
July 9, 2005
August 1, 2009
September 25, 2015
27 years after treatmentOld Wooden Retaining Wall Replacement
Elbow River, Calgary October 2, 2014Elbow River, Calgary October 2, 2014
Elbow River, Calgary December 15, 2014
Slope is in rough shapeElbow River, Calgary April 9, 2015
Elbow River, Calgary April 10, 2015
Elbow River, Calgary April 11, 2015
Elbow River, Calgary April 18, 2015
Elbow River, Calgary April 18, 2015
Elbow River, Calgary July 21, 2015
Broadway Run Landslide Treatment
Slide adds sediment to the Cowichan River, January 8, 2015February 4, 2013
August 21, 2014
Ripping apart old stumps
Treatment designed to use natural processes of landslide recovery to treat the slide.
March 14, 2015Dense live staking
Slows flow velocities, adds root strength and removes excess water. Assists recovery.
March 14, 2015Sprouts appear on most cuttings, April 23, 2015
Great promise for a green spring, April 23, 2015
June 8, 2015, looking down towards the river.
June 8, 2015, looking up from the river.
Even the horizontal cuttings are growing, June 8, 2015.
A cautionary tale…
June 20, 1997Covered with MBLs – October 25, 1997
Solved ??? the Mowhokam Creek Slide
March 21, 1998 mud flows
March 21, 1998 – surface soup
Surface mud flows topple horizontal structures
Wattle fences & MBLs have limited resistance to toppling - 1998
However, even a little stability helps - 2006
Still more work to do - 2006
Typical toppling failure
Live Smiles
Uses catenary curve to “suspend” mudSuspension bridge, Juan de Fuca Trail
Like a wattle fence built in a curve, Buckley Bay
Good for very wet sites
Abundant moisture allows good growth
June 24, 1999Initiates succession
Live smiles in 2005
Looking face on
Red-osier Dogwood doing well
January 2009
January 2009
Western Red Cedar naturally establishedHarvey Creek, near Quesnel
North Vancouver
Fisher Creek, near Chetwynd
Live Pole Drains
Intersecting the water
Installing Live Pole Drains, 1985
Drains moisture immediately
1986, first spring after installationCuttings sprout and grow, 1988
July 16, 1999
Business end of live pole drain,
July 16, 1999Still draining water after 14 years, July 16, 1999
Note rock shapeJuly 9, 2005
August 1, 2009
Business end of live pole drain, August 1, 2009
Water flow area in a dry year, 24 years after installation, August 1, 2009
Eventually these seepage areas are colonized by Devil’s Cub and Cedar
Large block slumping – treated with live pole drains, May 9, 1987
Live pole drains, May 9, 1987
August, 1987
Drains sprout and growAugust, 1992
Continued growth of drainsJuly, 1999
Continued growth, no sign of block movingContinued growth, no sign of block moving
July, 9, 2005Still growing, no sign of block moving
August 1, 2009Modified Brush Layers
Shady SitesCapilano Park Slope Restoration
Steep slope covered with invasive species
Invasives removal, November 18, 2013
Aerial tram installed for moving materials, November 21, 2013
Loading tram for ride up hill, November 21, 2013
Installing MBLs, Nov. 22, 2013
Installing MBLs, Nov. 22, 2013
Installing MBLs, Nov. 22, 2013
September 1, 2014
Capilano ParkSeptember 1, 2014
Capilano ParkMBL on creek bank, Coquitlam
MBL on creek bank, Pearson College
Two open slope slides into gullies
Sidewalls can be treated with MBLs, but what about the gullies?
Compacted till and rocks
Live gully breaks
Live gully breaks act like check dams
Like natural step-pools, this flow is no longer a torrent.
Assisting in the recovery of degraded sites.
October 29, 2013
What will happen in this ditch when it starts raining?
So now it is raining and sediment is washing into a sensitive wetland
Is this an effective silt control system???
A high-tech solution… Live silt fences, February 20, 1992
February 20, 1992
Cuttings used to slow the flow and start the wetland successional processesMay 11, 1992
January 30, 1993
April 9, 1997
April 9, 1997
How can we restore a wetland that has been lost due to construction of a drainage ditch?
Regulatory issues
Producers and MAL meet to discuss solutions
Slow the water velocities
By using woody pioneering species to slow the flows we prevent erosion and start the successional processes that will lead to wetland development.
Cuttings starting to grow
May 18, 2006June 18, 2007
Hey, look at that, cattails have moved in!June 24, 2008
May 12, 2009
Live Palisades
Live Palisades Cross Section
Cottonwood poles are collected and soaked
Excavator used to dig trench to water table
Live palisade construction and live gravel bar staking
Cuttings grow forming a wall of woody vegetation
Mimics natural cottonwood standsCottonwood growth after 3 years
Germaine Creek, Fall, 2004
Double row of live palisadesLive palisades at Germaine Creek, September 8, 2005
Live Staking, a simple but effective tool for a variety of uses
Revegetating riverbanks, Elk River, 1977
Pocket Planting
Forests create pockets of organic matter between the large rocks on talus slopes
Pocket Planting
Pocket planting detail
Pocket planting Seaton River
August 15, 2002Pocket planting Seaton River June 13, 2006
June 30, 2013
Pocket planting Seaton River March 24, 2014
Natural successional processes on gravel bars
Natural establishment of vegetation on gravel bars builds the bars
Pioneering species can change the context of the ecosystems in which they grow
Live Gravel Bar Staking
Live Gravel Bar Staking
Live Gravel Bar Staking, Oktwanch River, bare gravel bar
Live Gravel Bar Staking, Oktwanch River, inserting cuttings
Live Gravel Bar Staking, Oktwanch River, growing
Starting to collect finer sediments
Installing cuttings on San Juan River bar March 12, 1998
Note small machineCuttings growing
May 19, 1998Sprouts collect small woody debris
March 12, 1999Sediment collects in slack water behind small woody debris jams
March 12, 1999Once twigs too small to collect debris, sediment collection stops
March 12, 1999This leaves enough sticking out so that the cuttings can grow again the following summer
June 29, 1999New plants and large woody debris, October 31, 2002
Continued successional development
June 2, 2006Understory starting to diversify
June 2, 2006Western red cedar starting to appear
As the gravel bar builds, the thalwag deepens, June 2, 2006
June 19, 2011
A dense stand of willows and other species have developed on the bar.
June 19, 2011The root infused sand is relatively erosion resistant (June 19, 2011)
June 10, 2014
May 13, 2015
May 13, 2015
June 10, 2014
Sitka Spruce establishing under the canopy of pioneering speciesCollecting cuttings at Germaine Creek, YT, Fall, 2004
Soaking cuttings at Germaine Creek, Fall, 2004
Live gravel bar staking at Germaine Creek, Fall, 2004
Live gravel bar staking at Germaine Creek, Fall, 2004
Live gravel bar staking at Germaine Creek, Fall, 2004
Klondike River at Germaine Creek, Break-up, 2005
Klondike River at Germaine Creek, May 19, 2005
Klondike River at Germaine Creek, June 3, 2005
Live gravel bar staking at Germaine Creek, June, 2005
Live gravel bar staking at Germaine Creek, September 6, 2005
Live gravel bar staking at Germaine Creek, September 16, 2005
Live gravel bar staking at Germaine Creek, August 8, 2006
Live gravel bar staking at Germaine Creek, September 14, 2006, significant sand deposition.
30 cm in this area…
August 12, 2007
August 6, 2007
Additional sediment and woody debrisJuly 14, 2008
August 5, 2014
August 5, 2014
Live Staking to Control Erosion
Developer cleared streambank
Cuttings ready to go
Dense live staking slows flows, December 18, 2005
Growing, July 14, 2006
May 1, 2010